Skip to content

Edit Study Configuration

1. 👆 Go to Studies 👉 Click the Configuration button.

Edit Payee Roles

Tip

"Default Payee Roles" is a list of cost sharing roles that can be assigned to entities who pay shares towards studies. The list can be found on every study record (Costs & Invoicing 👉 Cost Sharing 👉 Sharing Rules).
The below steps show how to edit the list for the whole partition (all studies).
To only change the list for a specific study, the study manager is able to override and customise the list in the "Sharing Rules" tab.

2. 👆 Click "×" to remove roles.

3. 👆 Click the "Cost Sharing Roles" field and choose a new option from the drop-down list to add roles.

4. 👆 Click "SAVE".

5. 🥳 Cost Sharing Roles updated.

A green banner will appear to indicate that the change was successful.

Edit Timeline Templates

Tip

For every study created, there is a "General Timeline" generated. There are also "Study Number Timeline"s created for each Activity in the study. The timelines are created using the templates in Study Configuration. Existing timelines will not be affected when the template is changed.

6. 👆 Click the pencil icon to edit the General Timeline template.

7. 👆 Click "Add Milestone" to create a new timeline event.

9. 👆 Choose who is responsible for the item.

10. 👆 Click "SAVE".

11. 👆 Click the pencil icon to edit the Study Number Timeline template.

When a study's status is changed from "Active" to "Planned", the "Planned Date" fields can be automatically populated. It is populated if there is a number entered into the highlighted fields below. If left empty the date will not get populated. The "Planned Date" given will be the date of status change plus the number of days input into the field.

Populating this field will set the "Planned Date" to be automatically populated. When the "Planned Date" for the above milestone is filled in, the current milestone will be populated. If left empty the date will not get populated. The "Planned Date" given will be the date from the previous milestone plus the number of days input into the field.

14. 👆 Click "SAVE".

15. Follow the tutorials below to generate a new Study Number Timeline:

Create a Study - The General Timeline is created for every study.
Create Study Activities and Set up the Timeline - The Study Number Timeline appears only for studies that have "Activities".

16. 🥳 See that the new milestone added in steps 8-10 is present in the General Timeline.

17. 🥳 See that milestone "10." has been autopopulated (set up in step 12).

18. 🥳 See that milestone "50." has been autopopulated after the prior milestone was filed (set up in step 13).

Adjust Cost Share Percentages

Tip

See that for the following study, the entity "Alvanco Chemicals Ltd" has two shares. "Penman Consulting bvba" has one share. The costs are split 3 ways. It is possible to change the way costs are split. By default, shares are split equally.

19. 👆 Navigate to Studies 👉 Configuration.

20. ✍️ Change the value in the "Additional Share %" field.

By default, the value is 100.

21. 👆 Click "SAVE".

22. 🥳 See the costs are now split unequally.